Project Brupegvidéo

Important Safety Upgrades! - Project Brupeg Ep.439

8 mars 2026 · 21 min · 13K vues

Ce que couvre cette vidéo

Fabrication of custom stainless steel handrails for the 10-year rebuild of the former fishing trawler *Brupeg* focuses on improving deck safety.0:03 The crew uses 316-grade, schedule 10 heavy-wall stainless steel tubing to construct the rails, mirroring the height of existing forward sections at 322 millimeters.1:16 To ensure structural integrity and ease of installation, the team pre-welds 90-degree elbows and vertical supports before tacking the assemblies onto the deck.6:01 When the TIG welder fails, the project switches to MIG welding to maintain progress despite intermittent heavy rain and limited workspace.8:13 The design features a leapfrog configuration along the side decks, with the aft section remaining undecided to allow for cargo movement.1:53 The crew prioritizes high rails to compensate for the vessel's original low bulwarks, which were designed for commercial net handling.10:40 Periodic inspections of the hull reveal significant soft marine growth, which the crew expects to slough off once the vessel is underway.17:35

Regarder sur YouTube

Plus de vidéos de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct. 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sept. 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sept. 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sept. 2026

De Project Brupeg — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème