Project Brupegvideo

Important Safety Upgrades! - Project Brupeg Ep.439

8 de marzo de 2026 · 21 min · 13K vistas

¿Qué cubre este video?

Fabrication of custom stainless steel handrails for the 10-year rebuild of the former fishing trawler *Brupeg* focuses on improving deck safety.0:03 The crew uses 316-grade, schedule 10 heavy-wall stainless steel tubing to construct the rails, mirroring the height of existing forward sections at 322 millimeters.1:16 To ensure structural integrity and ease of installation, the team pre-welds 90-degree elbows and vertical supports before tacking the assemblies onto the deck.6:01 When the TIG welder fails, the project switches to MIG welding to maintain progress despite intermittent heavy rain and limited workspace.8:13 The design features a leapfrog configuration along the side decks, with the aft section remaining undecided to allow for cargo movement.1:53 The crew prioritizes high rails to compensate for the vessel's original low bulwarks, which were designed for commercial net handling.10:40 Periodic inspections of the hull reveal significant soft marine growth, which the crew expects to slough off once the vessel is underway.17:35

Ver en YouTube

Más de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sep 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sep 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sep 2026

De Project Brupeg — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema