RAN Sailingvídeo
Cutting Out the Chain Locker Bulkhead - Ep. 417 RAN Sailing
15 de noviembre de 2024 · 18 min · 108K visitas · Skåne
Qué cubre este vídeo
Johan fabricates a new bulkhead for the chain locker using a CNC router and PET foam.0:17 He designs the bulkhead to leave the bottom section open, ensuring any future leaks from the chain locker remain visible in the adjacent dry storage area rather than hidden behind foam epoxy.2:01 After cutting the panel, he confirms a precise fit against the hull, noting that the gap at the edges will be filled during the subsequent fiberglass tabbing process.6:16 The chain locker design includes a deep drop to prevent chain buildup near the windlass and provides space for a ladder and storage for spinnaker lines and fenders.6:56
Simultaneously, the crew continues laminating floor beams using a vacuum bagging process.12:07 Cold temperatures in the workspace thicken the epoxy, slowing saturation and extending the work time.12:25 To mitigate this, Johan uses an infrared heater to preheat the hull surface before applying epoxy.17:05 He prepares to laminate three additional floor beams, utilizing a vacuum pump and a series of valves to manage the process across multiple stations.9:55
Más de RAN Sailing
De RAN Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



