RAN Sailingvídeo

Cutting Out the Chain Locker Bulkhead - Ep. 417 RAN Sailing

15 de novembro de 2024 · 18 min · 108K visualizações · Skåne

O que este vídeo aborda

Johan fabricates a new bulkhead for the chain locker using a CNC router and PET foam.0:17 He designs the bulkhead to leave the bottom section open, ensuring any future leaks from the chain locker remain visible in the adjacent dry storage area rather than hidden behind foam epoxy.2:01 After cutting the panel, he confirms a precise fit against the hull, noting that the gap at the edges will be filled during the subsequent fiberglass tabbing process.6:16 The chain locker design includes a deep drop to prevent chain buildup near the windlass and provides space for a ladder and storage for spinnaker lines and fenders.6:56

Simultaneously, the crew continues laminating floor beams using a vacuum bagging process.12:07 Cold temperatures in the workspace thicken the epoxy, slowing saturation and extending the work time.12:25 To mitigate this, Johan uses an infrared heater to preheat the hull surface before applying epoxy.17:05 He prepares to laminate three additional floor beams, utilizing a vacuum pump and a series of valves to manage the process across multiple stations.9:55

Ver no YouTube

Mais de RAN Sailing

Something's Not Right Here! Building Our 52ft Sailboat - Ep. 50209/2026This Is Where Boat Builds Break People - Ep. 501 Ran Sailing08/2026Our 52ft Sailboat Build Reaches Another Milestone! - Ep. 500 Ran Sailing08/2026How Many Hatches Does a 52ft Sailboat Need? - Ep. 499 Ran Sailing08/2026

De RAN Sailing — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema