Velero Reginavídeo

Refit finished. We have finally finished the deck renovation on Regina.

9 de junio de 2023 · 10 min · 2K visitas · Marina Lanzarote, Arrecife

Qué cubre este vídeo

Javi completes a multi-month deck restoration on the boat Regina at Marina Lanzarote.Watch The project involved removing the original aluminum toe rail and various deck-mounted hardware before repainting the entire surface.0:54 The crew applied a non-skid finish using silica sand, utilizing a coarser 0.5–1.0 mm grade for the main deck and a finer 0–0.5 mm grade for the cockpit coamings.4:39 Additional upgrades include restored dorade vents and new deck fills for water and diesel.2:14 Javi also installed a new mast structure to facilitate reefing operations.1:15 During the three-month refit, the dinghy remained in the water, resulting in significant marine growth and barnacle accumulation on the hull.5:31 Javi cleaned the dinghy using a scraper and scouring pads, noting that long-term immersion without maintenance severely fouls the hull.9:41

Ver en YouTube

Más de Velero Regina

In search of the new boatoct 2026Sailing on the Regina one last timesept 2026Preparing Regina for the new ownersept 2026Regina has been soldsept 2026

De Velero Regina — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema