Velero Reginavideo

Refit finished. We have finally finished the deck renovation on Regina.

June 9, 2023 · 10 min · 2K views · Marina Lanzarote, Arrecife

What this video covers

Javi completes a multi-month deck restoration on the boat Regina at Marina Lanzarote.Watch The project involved removing the original aluminum toe rail and various deck-mounted hardware before repainting the entire surface.0:54 The crew applied a non-skid finish using silica sand, utilizing a coarser 0.5–1.0 mm grade for the main deck and a finer 0–0.5 mm grade for the cockpit coamings.4:39 Additional upgrades include restored dorade vents and new deck fills for water and diesel.2:14 Javi also installed a new mast structure to facilitate reefing operations.1:15 During the three-month refit, the dinghy remained in the water, resulting in significant marine growth and barnacle accumulation on the hull.5:31 Javi cleaned the dinghy using a scraper and scouring pads, noting that long-term immersion without maintenance severely fouls the hull.9:41

Watch on YouTube

More from Velero Regina

In search of the new boatOct 2026Sailing on the Regina one last timeSep 2026Preparing Regina for the new ownerSep 2026Regina has been soldSep 2026

From Velero Regina — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue