Shipyard Time! WET SANDING, Propeller Painting, and More! - Ep. 52
4 de noviembre de 2023 · 14 min · 718 visitas · Nanaimo
Qué cubre este vídeo
The crew of Sea Dream of Clyde hauled out at Newcastle Boat Yard in Nanaimo to perform hull maintenance and bottom painting.Watch Tasks included wet sanding the hull using drywall screens, removing stains with FSR, and repairing a damaged section of the cast iron keel with Marine Tex.1:13 To improve hydrodynamics and accommodate the weight of two people living aboard, the crew raised the waterline to a new blue boot stripe.9:27 They also sanded the propeller and applied Sea Guard zinc spray to inhibit barnacle growth.8:56 A clogged sink drain was cleared after the discovery of a blockage caused by a vegetable.4:53 Following the haul out, the crew modified a first-generation SodaStream to save space and removed obsolete life raft mounting hardware.10:32 The vessel departed for Twin Beaches and Kendrick Island to begin a southward passage.12:58 Thorough surface preparation remains the most critical factor in ensuring bottom paint adhesion and preventing peeling.5:55
Barcos en este vídeo
Más de Sailing Sea Dream of Clyde
De Sailing Sea Dream of Clyde — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



