Sailing Sea Dream of Clydevidéo

Shipyard Time! WET SANDING, Propeller Painting, and More! - Ep. 52

4 novembre 2023 · 14 min · 718 vues · Nanaimo

Ce que couvre cette vidéo

The crew of Sea Dream of Clyde hauled out at Newcastle Boat Yard in Nanaimo to perform hull maintenance and bottom painting.Watch Tasks included wet sanding the hull using drywall screens, removing stains with FSR, and repairing a damaged section of the cast iron keel with Marine Tex.1:13 To improve hydrodynamics and accommodate the weight of two people living aboard, the crew raised the waterline to a new blue boot stripe.9:27 They also sanded the propeller and applied Sea Guard zinc spray to inhibit barnacle growth.8:56 A clogged sink drain was cleared after the discovery of a blockage caused by a vegetable.4:53 Following the haul out, the crew modified a first-generation SodaStream to save space and removed obsolete life raft mounting hardware.10:32 The vessel departed for Twin Beaches and Kendrick Island to begin a southward passage.12:58 Thorough surface preparation remains the most critical factor in ensuring bottom paint adhesion and preventing peeling.5:55

Regarder sur YouTube

Bateaux dans cette vidéo

Westerly Yachts Ltd. Discus 33Leur bateau

Plus de vidéos de Sailing Sea Dream of Clyde

How To Replace Rigging & Emergency OFFSHORE Repairsmai 2026Sailing Into The Wilds Of Alaska - Starting The Inside Passage With A BANG! - Ep. 108mai 202624 Days Across The Pacific: From Tropics to Glaciersfévr. 2026This Is What Sailing Hawaii Actually Looks Like | Hilo to Honolulufévr. 2026

De Sailing Sea Dream of Clyde — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème