Entre Terras e Maresvídeo

WE DID IT! WE FINISHED THE CAPTAIN'S SUITE SINK! S1.ep180

31 de mayo de 2026 · 20 min · 231 visitas

Qué cubre este vídeo

Edgar and Sâmia complete the installation of a custom sink and vanity unit in the captain’s suite of their boat.18:10 The project involves fabricating a wooden countertop, applying Formica laminate using epoxy, and installing a sink basin sealed with P.U. sealant.7:28 To accommodate the plumbing for a gas heater and water lines, Edgar modifies the vanity structure, creating precise cutouts for PEX tubing and gas hoses.3:32 He secures the countertop using aluminum angle brackets and reinforces the sink basin with mechanical supports rather than relying solely on adhesive.18:40 The final assembly includes a custom handle and finished edges, with the vanity designed to accommodate a future electric marine toilet.9:16 The installation process highlights the challenges of working in tight spaces, including the need for manual tool use when power tools cannot reach, and the importance of sealing all wood edges with P.U. to prevent water damage in the head.16:54

Ver en YouTube

Más de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183jul 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182jun 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun 2026This week the focus was on something elsejun 2026

De Entre Terras e Mares — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema