More
Language
Display mode
Entre Terras e Maresvideo
May 31, 2026 · 20 min · 228 views
What this video covers
Edgar and Sâmia complete the installation of a custom sink and vanity unit in the captain’s suite of their boat.▶ 18:52 The project involves fabricating a wooden countertop, applying Formica laminate using epoxy, and installing a sink basin sealed with P.U. sealant.▶ 7:26 To accommodate the plumbing for a gas heater and water lines, Edgar modifies the vanity structure, creating precise cutouts for PEX tubing and gas hoses.▶ 2:23 He secures the countertop using aluminum angle brackets and reinforces the sink basin with mechanical supports rather than relying solely on adhesive.▶ 12:44 The final assembly includes a custom handle and finished edges, with the vanity designed to accommodate a future electric marine toilet.▶ 9:17 The installation process highlights the challenges of working in tight spaces, including the need for manual tool use when power tools cannot reach, and the importance of sealing all wood edges with P.U. to prevent water damage in the head.▶ 11:39
More from Entre Terras e Mares
From Entre Terras e Mares — see the channel’s boat, crew, and every analyzed video.