Entre Terras e Maresvídeo

WE DID IT! WE FINISHED THE CAPTAIN'S SUITE SINK! S1.ep180

31 de maio de 2026 · 20 min · 231 visualizações

O que este vídeo aborda

Edgar and Sâmia complete the installation of a custom sink and vanity unit in the captain’s suite of their boat.18:10 The project involves fabricating a wooden countertop, applying Formica laminate using epoxy, and installing a sink basin sealed with P.U. sealant.7:28 To accommodate the plumbing for a gas heater and water lines, Edgar modifies the vanity structure, creating precise cutouts for PEX tubing and gas hoses.3:32 He secures the countertop using aluminum angle brackets and reinforces the sink basin with mechanical supports rather than relying solely on adhesive.18:40 The final assembly includes a custom handle and finished edges, with the vanity designed to accommodate a future electric marine toilet.9:16 The installation process highlights the challenges of working in tight spaces, including the need for manual tool use when power tools cannot reach, and the importance of sealing all wood edges with P.U. to prevent water damage in the head.16:54

Assistir no YouTube

Mais de Entre Terras e Mares

90% of the STRUCTURE is READY S1.ep 183jul. de 2026WE FINISHED the bow cabin LAMINATE ! S1.ep182jun. de 2026WE DID IT, WE FINISHED PART OF THE FORMICA IN THE BOW SUITE S1.ep 181jun. de 2026This week the focus was on something elsejun. de 2026

De Entre Terras e Mares — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema