Project Brupegvídeo
Internal Wing Strengthening - Project Brupeg Ep.133
13 de abril de 2020 · 17 min · 22K visitas
Qué cubre este vídeo
Damien upgrades the earth lead on his welding equipment using a 95mm copper cable to prevent melting under high amperage.0:23 He then focuses on structural reinforcement for the vessel's stabilizer wings, welding 6mm flat bar gussets and 20mm bar stock to create internal cross-bracing and baffles.7:48 These internal supports distribute load across the wing skin and provide rigidity for the hinge assembly.8:36 The construction process involves welding the skin to internal ribs by cutting slots through the exterior plate and filling them with weld.11:53 Once assembled, the wings will undergo pressure testing at 10 psi using soapy water to detect leaks.11:57 The design incorporates advice from a commercial fisherman at Lakes Entrance, Australia, who has three decades of experience with stabilizer wing evolution.13:24 The current stainless steel hinges are temporary; the crew plans to replace them with robust, mild steel piano-style hinges during a future haul-out.15:32
Más de Project Brupeg
De Project Brupeg — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



