Internal Wing Strengthening - Project Brupeg Ep.133

13 de abril de 2020 · 17 min · 22K visualizações

O que este vídeo aborda

Damien upgrades the earth lead on his welding equipment using a 95mm copper cable to prevent melting under high amperage.0:23 He then focuses on structural reinforcement for the vessel's stabilizer wings, welding 6mm flat bar gussets and 20mm bar stock to create internal cross-bracing and baffles.7:48 These internal supports distribute load across the wing skin and provide rigidity for the hinge assembly.8:36 The construction process involves welding the skin to internal ribs by cutting slots through the exterior plate and filling them with weld.11:53 Once assembled, the wings will undergo pressure testing at 10 psi using soapy water to detect leaks.11:57 The design incorporates advice from a commercial fisherman at Lakes Entrance, Australia, who has three decades of experience with stabilizer wing evolution.13:24 The current stainless steel hinges are temporary; the crew plans to replace them with robust, mild steel piano-style hinges during a future haul-out.15:32

Assistir no YouTube

Mais de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463out. de 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462set. de 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461set. de 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460set. de 2026

De Project Brupeg — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema