Project Brupegvideo

Internal Wing Strengthening - Project Brupeg Ep.133

13 April 2020 · 17 min · 22K views

What this video covers

Damien upgrades the earth lead on his welding equipment using a 95mm copper cable to prevent melting under high amperage.0:23 He then focuses on structural reinforcement for the vessel's stabilizer wings, welding 6mm flat bar gussets and 20mm bar stock to create internal cross-bracing and baffles.7:48 These internal supports distribute load across the wing skin and provide rigidity for the hinge assembly.8:36 The construction process involves welding the skin to internal ribs by cutting slots through the exterior plate and filling them with weld.11:53 Once assembled, the wings will undergo pressure testing at 10 psi using soapy water to detect leaks.11:57 The design incorporates advice from a commercial fisherman at Lakes Entrance, Australia, who has three decades of experience with stabilizer wing evolution.13:24 The current stainless steel hinges are temporary; the crew plans to replace them with robust, mild steel piano-style hinges during a future haul-out.15:32

Watch on YouTube

More from Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463Oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462Sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461Sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460Sept 2026

From Project Brupeg — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue