Sampson Boat Covídeo

Deck Blocking! (Rebuilding Tally Ho / EP113)

18 de diciembre de 2021 · 21 min · 447K visitas · Sequim

Qué cubre este vídeo

The restoration of the 111-year-old yacht Tally Ho requires the installation of hardwood deck blocking to support deck strakes, hardware, and structural components.0:13 These blocks, fashioned from Angelique, oak, and purple heart, fill voids between deck beams where deck plank nibs terminate or where through-bolted hardware like the capstan, anchor windlass, Samson posts, and bollards require backing.6:11 The team mills the blocks to fit square-cut pockets routed into the deck beams, then drills pilot holes for fasteners.3:13 In addition to blocking, the crew processes Alaskan Yellow Cedar stock into 2-inch thick by 3-inch wide deck planks by planing and ripping the timber to size.8:57 Work also progresses on the cockpit framing, including the installation of carlins and spur beams to support the deck and hatch structure.17:18 The completed blocks remain dry-fitted pending the installation of diagonal bronze strapping and final surface preparation.18:05

Ver en YouTube

Más de Sampson Boat Co

Tally Ho sails into England after 59 years overseas!ago 2026A very brief update from the Fal estuaryago 2026Piracy and Peril - stories from the boatyards of West Corkago 2026Tally Ho completes her Atlantic Crossing at the Fastnet Rock!ago 2026

De Sampson Boat Co — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema