Sampson Boat Covidéo

Deck Blocking! (Rebuilding Tally Ho / EP113)

18 décembre 2021 · 21 min · 447K vues · Sequim

Ce que couvre cette vidéo

The restoration of the 111-year-old yacht Tally Ho requires the installation of hardwood deck blocking to support deck strakes, hardware, and structural components.0:13 These blocks, fashioned from Angelique, oak, and purple heart, fill voids between deck beams where deck plank nibs terminate or where through-bolted hardware like the capstan, anchor windlass, Samson posts, and bollards require backing.6:11 The team mills the blocks to fit square-cut pockets routed into the deck beams, then drills pilot holes for fasteners.3:13 In addition to blocking, the crew processes Alaskan Yellow Cedar stock into 2-inch thick by 3-inch wide deck planks by planing and ripping the timber to size.8:57 Work also progresses on the cockpit framing, including the installation of carlins and spur beams to support the deck and hatch structure.17:18 The completed blocks remain dry-fitted pending the installation of diagonal bronze strapping and final surface preparation.18:05

Regarder sur YouTube

Plus de vidéos de Sampson Boat Co

Tally Ho sails into England after 59 years overseas!août 2026A very brief update from the Fal estuaryaoût 2026Piracy and Peril - stories from the boatyards of West Corkaoût 2026Tally Ho completes her Atlantic Crossing at the Fastnet Rock!août 2026

De Sampson Boat Co — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème