Hold Fast!vídeo
S/V Corsair Post-Refit Shakedown Cruise
28 de febrero de 2017 · 6 min · 3K visitas · Harrington Harbor, Maryland
Qué cubre este vídeo
S/V Corsair completes a post-refit shakedown cruise in the Chesapeake Bay during late February 2017.0:03 The vessel departs Harrington Harbor South for St. Michael’s in 70-degree weather with a southerly breeze.Watch After an overnight stay at Sagan’s Boat Yard, the boat sails to Annapolis in 10 to 11 knots of wind.2:00 A cold front arrives before the return trip, dropping temperatures to 39 degrees for the final leg back to Harrington Harbor.4:56 During the return, the boat reaches speeds of nine knots in challenging wind conditions.6:24 The refit proves successful, though the owner identifies several minor items requiring further adjustment.6:39
Barcos en este vídeo
Más de Hold Fast!
De Hold Fast! — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



