Hold Fast!vídeo

S/V SeaSprite Refit Update 18-20 Sep 2026

20 de septiembre de 2026 · 4 min · 1K visitas · Phipps Footworks

Qué cubre este vídeo

Refinishing the teak on the S/V SeaSprite involves stripping and sanding the cockpit coaming boards, the eyebrow, and the toe rail.0:35 After initial sanding with 120-grit paper, the coaming boards required an 80-grit pass to remove remaining varnish before finishing with 120-grit.2:46 The cockpit cubbies and radiuses were sanded by hand.3:04 The project includes installing midship cleats into the toe rail to improve spring line handling, addressing a design oversight that previously forced the use of shrouds or cockpit winches for mooring.1:36 The mast and boom were moved to the Phipps Footworks shed for painting.2:17 Additional upgrades include replacing old plastic cockpit drains with new bronze units from Spartan and installing mid-rail chocks.4:31 Old adhesive sealant was removed from the starboard side coaming area in preparation for final cleaning with acetone and subsequent varnishing.4:05

Ver en YouTube

Barcos en este vídeo

Sea SPRITE 30Su barcoCabo RICO 38Su barcoCabo RICO 56Su barco

Más de Hold Fast!

S/V SeaSprite Refit Update 9 September 2026sept 2026S/V SeaSprite Refit Update 8 September 2026sept 2026S/V SeaSprite Refit Update - 4 Sep 2026sept 2026S/V SeaSprite Refit Update - 19 August 2026ago 2026

De Hold Fast! — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema