Sailing The Far Sidevídeo
LAZY JACKS and STACK BAG DONE!!! We also fix our TRANSMISSION LEAK and more Diving!! [S2:E31]
4 de marzo de 2021 · 17 min · 30K visitas
Qué cubre este vídeo
The crew of The Far Side repairs a transmission fluid leak by replacing the shifter arm seal.1:34 After discovering transmission oil in the bilge, they remove the shifter arm, install a new seal, and refill the transmission fluid.1:08 The project successfully stops the leak.3:55 Additionally, the crew installs a custom-sewn stack pack and lazy jack system while anchored in West Bay.9:53 They mount rollers on the mast at 70% height, install grommets for the lines, and secure the bag to the boom using improvised attachments between the sail slides.10:35 The installation remains incomplete pending the addition of PVC battens and proper sail slides.15:48 Between maintenance tasks, the crew dives at a nearby shipwreck and recovers a lost bed sheet from the seafloor.8:56
Más de Sailing The Far Side
De Sailing The Far Side — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



