Sailing The Far Sidevidéo

LAZY JACKS and STACK BAG DONE!!! We also fix our TRANSMISSION LEAK and more Diving!! [S2:E31]

4 mars 2021 · 17 min · 30K vues

Ce que couvre cette vidéo

The crew of The Far Side repairs a transmission fluid leak by replacing the shifter arm seal.1:34 After discovering transmission oil in the bilge, they remove the shifter arm, install a new seal, and refill the transmission fluid.1:08 The project successfully stops the leak.3:55 Additionally, the crew installs a custom-sewn stack pack and lazy jack system while anchored in West Bay.9:53 They mount rollers on the mast at 70% height, install grommets for the lines, and secure the bag to the boom using improvised attachments between the sail slides.10:35 The installation remains incomplete pending the addition of PVC battens and proper sail slides.15:48 Between maintenance tasks, the crew dives at a nearby shipwreck and recovers a lost bed sheet from the seafloor.8:56

Regarder sur YouTube

Plus de vidéos de Sailing The Far Side

Sailing A Catamaran To A National Park In The MIDDLE Of NOWHERE!! S4:E18juil. 2026Dingy Rides On The RIO DUCLE, Custom SAILBOATS, And TUK TUKS S4:E18mars 2026Want Check OUT OUR Portholes?? Our Steps To A DRY BOAT S4: E17févr. 2026Is Our Motor DONE?! Going Over Every Nook & Cranny | S4:E16janv. 2026

De Sailing The Far Side — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème