Sailing The Far Sidevídeo

LAZY JACKS and STACK BAG DONE!!! We also fix our TRANSMISSION LEAK and more Diving!! [S2:E31]

4 de março de 2021 · 17 min · 30K visualizações

O que este vídeo aborda

The crew of The Far Side repairs a transmission fluid leak by replacing the shifter arm seal.1:34 After discovering transmission oil in the bilge, they remove the shifter arm, install a new seal, and refill the transmission fluid.1:08 The project successfully stops the leak.3:55 Additionally, the crew installs a custom-sewn stack pack and lazy jack system while anchored in West Bay.9:53 They mount rollers on the mast at 70% height, install grommets for the lines, and secure the bag to the boom using improvised attachments between the sail slides.10:35 The installation remains incomplete pending the addition of PVC battens and proper sail slides.15:48 Between maintenance tasks, the crew dives at a nearby shipwreck and recovers a lost bed sheet from the seafloor.8:56

Ver no YouTube

Mais de Sailing The Far Side

Sailing A Catamaran To A National Park In The MIDDLE Of NOWHERE!! S4:E1807/2026Dingy Rides On The RIO DUCLE, Custom SAILBOATS, And TUK TUKS S4:E1803/2026Want Check OUT OUR Portholes?? Our Steps To A DRY BOAT S4: E1702/2026Is Our Motor DONE?! Going Over Every Nook & Cranny | S4:E1601/2026

De Sailing The Far Side — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema