Sailing Zataravídeo

Why SHE WON'T HELP build the barn 🛠️ (Ep 341)

30 de octubre de 2025 · 20 min · 105K visitas · Montana

Man marks steel beam with laser for barn frame

Qué cubre este vídeo

Construction of a barn in the mountains continues as the crew completes the installation of overhangs, girts, and purlins across the frame.0:25 Keith Whitaker utilizes a laser level to ensure structural squareness and alignment before framing window and door openings.3:55 The team, including Jack Whitaker and Remy, operates an assembly-line process to install clips and frames for the structure.3:39 The project requires frequent supply runs to a Home Depot located one hour away, as Amazon deliveries are restricted to the base of the mountain.13:57 Renee Whitaker manages logistics, meal preparation, and material procurement while avoiding high-altitude work due to an irrational fear of heights.15:06 The team successfully installs an $800 door and base trim, with plans to add French doors in the coming days.18:11 The project serves as a transition for the family before they return to their boat for a planned Pacific crossing next year.19:41

Ver en YouTube

Más de Sailing Zatara

The (harsh) Reality of Taking Over Zatara!oct 2026It's Official: Zatara is SOLD!sept 2026FINALLY WEATHERPROOF! (Winter won't stop us now!)sept 2026From One Extreme to the Other!ago 2026

De Sailing Zatara — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema