Sailing Zataravidéo

Why SHE WON'T HELP build the barn 🛠️ (Ep 341)

30 octobre 2025 · 20 min · 105K vues · Montana

Man marks steel beam with laser for barn frame

Ce que couvre cette vidéo

Construction of a barn in the mountains continues as the crew completes the installation of overhangs, girts, and purlins across the frame.0:25 Keith Whitaker utilizes a laser level to ensure structural squareness and alignment before framing window and door openings.3:55 The team, including Jack Whitaker and Remy, operates an assembly-line process to install clips and frames for the structure.3:39 The project requires frequent supply runs to a Home Depot located one hour away, as Amazon deliveries are restricted to the base of the mountain.13:57 Renee Whitaker manages logistics, meal preparation, and material procurement while avoiding high-altitude work due to an irrational fear of heights.15:06 The team successfully installs an $800 door and base trim, with plans to add French doors in the coming days.18:11 The project serves as a transition for the family before they return to their boat for a planned Pacific crossing next year.19:41

Regarder sur YouTube

Plus de vidéos de Sailing Zatara

The (harsh) Reality of Taking Over Zatara!oct. 2026It's Official: Zatara is SOLD!sept. 2026FINALLY WEATHERPROOF! (Winter won't stop us now!)sept. 2026From One Extreme to the Other!août 2026

De Sailing Zatara — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème