Sailing Zataravídeo

Why SHE WON'T HELP build the barn 🛠️ (Ep 341)

30 de outubro de 2025 · 20 min · 104K visualizações · Montana

Man marks steel beam with laser for barn frame

O que este vídeo aborda

Construction of a barn in the mountains continues as the crew completes the installation of overhangs, girts, and purlins across the frame.0:25 Keith Whitaker utilizes a laser level to ensure structural squareness and alignment before framing window and door openings.3:55 The team, including Jack Whitaker and Remy, operates an assembly-line process to install clips and frames for the structure.3:39 The project requires frequent supply runs to a Home Depot located one hour away, as Amazon deliveries are restricted to the base of the mountain.13:57 Renee Whitaker manages logistics, meal preparation, and material procurement while avoiding high-altitude work due to an irrational fear of heights.15:06 The team successfully installs an $800 door and base trim, with plans to add French doors in the coming days.18:11 The project serves as a transition for the family before they return to their boat for a planned Pacific crossing next year.19:41

Assistir no YouTube

Mais de Sailing Zatara

From One Extreme to the Other!ago. de 2026Was that our Last Sail on Zatara? (+ big announcement! 📢)ago. de 2026Why We AREN'T Afraid of Sharks!jul. de 2026We (almost) Bought an Island! 🏝️jul. de 2026

De Sailing Zatara — veja o barco, a tripulação e cada vídeo analisado do canal.

The Sailing Directory Newsletter

Um e-mail com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira seu endereço para receber sua própria cópia.

Reportar um problema