The Sailing Brothersvídeo
Pacific Crossing Preparations, Engine Problems & Hull Farmyard Ep 116
7 de mayo de 2023 · 24 min · 19K visitas · Shelter Bay, Panama
Qué cubre este vídeo
The crew of the vessel Atlas troubleshoots an engine cooling issue while anchored near Taboga Island, Panama.0:59 After noticing the engine failed to pump sufficient water, they clean the raw water intake grill, clear the sieve, and replace the hose between the strainer and the water pump.3:25 A subsequent 7.5-mile motor confirms the engine temperature remains stable at 62 degrees Celsius.7:45 The crew also performs an underwater hull cleaning, removing significant barnacle and snail growth that accumulated in two and a half weeks despite the hull being copper-coated.10:29 They also clean the dinghy’s outboard motor, which had developed heavy fouling on the plastic propeller.14:29 Following the maintenance, the crew completes an 800-foot hike through the island’s interior, encountering local wildlife and steep terrain.18:36 The crew plans to depart for a Pacific crossing pending favorable weather windows.23:44 Regular maintenance of raw water systems and frequent hull cleaning are necessary to prevent overheating and maintain performance in tropical waters.
Barcos en este vídeo
Más de The Sailing Brothers
De The Sailing Brothers — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



