keeldraggervídeo
Baja Bash Wrap Up - San Diego to San Pedro
19 de enero de 2020 · 11 min · 925 visitas · Cabrillo Way Marina, San Pedro
Qué cubre este vídeo
Mark sails the boat from Shelter Island in San Diego to Cabrillo Way Marina in San Pedro, California, following a delivery from Mexico.Watch The 75-mile coastal passage takes approximately 18 hours, with the vessel maintaining speeds between five and six knots in calm conditions.1:52 The crew arrives before the 3 p.m. inspection cutoff, allowing them to secure a slip at the marina.3:53 Upon arrival, Mark identifies two primary mechanical issues: a persistent starter failure on the Volvo Penta 2003T engine and a leaking raw water pump.4:43 He attempts to troubleshoot the starter by inspecting a loose ground wire and assessing the accessibility of the mounting bolts.4:58 While the engine remains non-operational, Mark successfully installs and configures an AIS transceiver, integrating it with OpenCPN software on a MacBook Air to display vessel traffic and navigation data.8:54 Debbie completes a separate repair project on the boat's dinghy.10:18 Mark plans to consult a mechanic regarding the starter and the raw water pump.8:17
Barcos en este vídeo
Más de keeldragger
De keeldragger — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



