keeldraggervidéo
Baja Bash Wrap Up - San Diego to San Pedro
19 janvier 2020 · 11 min · 925 vues · Cabrillo Way Marina, San Pedro
Ce que couvre cette vidéo
Mark sails the boat from Shelter Island in San Diego to Cabrillo Way Marina in San Pedro, California, following a delivery from Mexico.Watch The 75-mile coastal passage takes approximately 18 hours, with the vessel maintaining speeds between five and six knots in calm conditions.1:52 The crew arrives before the 3 p.m. inspection cutoff, allowing them to secure a slip at the marina.3:53 Upon arrival, Mark identifies two primary mechanical issues: a persistent starter failure on the Volvo Penta 2003T engine and a leaking raw water pump.4:43 He attempts to troubleshoot the starter by inspecting a loose ground wire and assessing the accessibility of the mounting bolts.4:58 While the engine remains non-operational, Mark successfully installs and configures an AIS transceiver, integrating it with OpenCPN software on a MacBook Air to display vessel traffic and navigation data.8:54 Debbie completes a separate repair project on the boat's dinghy.10:18 Mark plans to consult a mechanic regarding the starter and the raw water pump.8:17
Bateaux dans cette vidéo
Plus de vidéos de keeldragger
De keeldragger — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



