keeldraggervideo
Baja Bash Wrap Up - San Diego to San Pedro
January 19, 2020 · 11 min · 925 views · Cabrillo Way Marina, San Pedro
What this video covers
Mark sails the boat from Shelter Island in San Diego to Cabrillo Way Marina in San Pedro, California, following a delivery from Mexico.Watch The 75-mile coastal passage takes approximately 18 hours, with the vessel maintaining speeds between five and six knots in calm conditions.1:52 The crew arrives before the 3 p.m. inspection cutoff, allowing them to secure a slip at the marina.3:53 Upon arrival, Mark identifies two primary mechanical issues: a persistent starter failure on the Volvo Penta 2003T engine and a leaking raw water pump.4:43 He attempts to troubleshoot the starter by inspecting a loose ground wire and assessing the accessibility of the mounting bolts.4:58 While the engine remains non-operational, Mark successfully installs and configures an AIS transceiver, integrating it with OpenCPN software on a MacBook Air to display vessel traffic and navigation data.8:54 Debbie completes a separate repair project on the boat's dinghy.10:18 Mark plans to consult a mechanic regarding the starter and the raw water pump.8:17
Boats in this video
More from keeldragger
From keeldragger — see the channel’s boat, crew, and every analyzed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



