Sailing Yabávídeo

Our TO DO list just got A LOT bigger! — Sailing Yabá #18

7 de marzo de 2021 · 29 min · 121K visitas · Ademir Shipyard, Brazil

Qué cubre este vídeo

The crew of the wooden schooner Yabá continues a major structural restoration by removing hull planks and assessing the condition of the internal ribs.7:11 Carpenter Zeca creates plywood stencils to replicate damaged frames, using them to measure and cut new timber replacements.2:57 The team uses chainsaws, crowbars, and hammers to strip the remaining hull planks, exposing the ribs for inspection and repair.7:28 To maintain structural integrity during the process, they install temporary support poles and retain specific planks that provide essential bracing.22:15

Work in the engine room involves removing rusted engine mounts and supports, which requires angle grinding stubborn bolts.12:26 The team identifies that previous repairs, which involved gluing over holes rather than replacing damaged wood, trapped moisture and accelerated rot.22:43 They plan to remove concrete ballast blocks to clear workspace and reduce stress on the weakened ribs.23:30 The project aims to replace compromised structural members and eliminate moisture traps to restore the vessel's hull integrity.

Ver en YouTube

Más de Sailing Yabá

Sailing to Rio: Exploring Brazil’s Most Famous City — Sailing Yabáago 2026Sailing to Ilha Grande: Prison Island transformed into Tropical Paradise! — Sailing Yabáago 2026This Anchorage Was Worth Every Miserable Mile — Sailing Yabáago 2026Sailing Fully Rigged at Night After Emergency Repairs — Sailing Yabáago 2026

De Sailing Yabá — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema