Sailing Yabávidéo
Our TO DO list just got A LOT bigger! — Sailing Yabá #18
7 mars 2021 · 29 min · 121K vues · Ademir Shipyard, Brazil
Ce que couvre cette vidéo
The crew of the wooden schooner Yabá continues a major structural restoration by removing hull planks and assessing the condition of the internal ribs.7:11 Carpenter Zeca creates plywood stencils to replicate damaged frames, using them to measure and cut new timber replacements.2:57 The team uses chainsaws, crowbars, and hammers to strip the remaining hull planks, exposing the ribs for inspection and repair.7:28 To maintain structural integrity during the process, they install temporary support poles and retain specific planks that provide essential bracing.22:15
Work in the engine room involves removing rusted engine mounts and supports, which requires angle grinding stubborn bolts.12:26 The team identifies that previous repairs, which involved gluing over holes rather than replacing damaged wood, trapped moisture and accelerated rot.22:43 They plan to remove concrete ballast blocks to clear workspace and reduce stress on the weakened ribs.23:30 The project aims to replace compromised structural members and eliminate moisture traps to restore the vessel's hull integrity.
Plus de vidéos de Sailing Yabá
De Sailing Yabá — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



