Sailing Yabávideo

Our TO DO list just got A LOT bigger! — Sailing Yabá #18

March 7, 2021 · 29 min · 121K views · Ademir Shipyard, Brazil

What this video covers

The crew of the wooden schooner Yabá continues a major structural restoration by removing hull planks and assessing the condition of the internal ribs.7:11 Carpenter Zeca creates plywood stencils to replicate damaged frames, using them to measure and cut new timber replacements.2:57 The team uses chainsaws, crowbars, and hammers to strip the remaining hull planks, exposing the ribs for inspection and repair.7:28 To maintain structural integrity during the process, they install temporary support poles and retain specific planks that provide essential bracing.22:15

Work in the engine room involves removing rusted engine mounts and supports, which requires angle grinding stubborn bolts.12:26 The team identifies that previous repairs, which involved gluing over holes rather than replacing damaged wood, trapped moisture and accelerated rot.22:43 They plan to remove concrete ballast blocks to clear workspace and reduce stress on the weakened ribs.23:30 The project aims to replace compromised structural members and eliminate moisture traps to restore the vessel's hull integrity.

Watch on YouTube

More from Sailing Yabá

Is a Huge Crew Always Better? (Bittersweet Voyage Surrounded by Whales) — Sailing YabáOct 2026Yabá gets Brand New Sails & Set Sail Immediately!— Sailing YabáOct 2026Everything Has to be Perfect: Preparing the Rig for Brand New Sails — Sailing YabáSep 2026Our Sails Ripped on Their Last Journey Before a Massive Upgrade! — Sailing YabáSep 2026

From Sailing Yabá — see the channel’s boat, crew, and every analyzed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue