Wildling Sailingvídeo

Ticking Off Jobs Under The Waterline | Wildling Sailing

30 de junio de 2023 · 20 min · 134K visitas · Amsterdam

Qué cubre este vídeo

Arthur repairs the rudders on his catamaran by applying fiberglass strips to the edges and filling air pockets with micro-filler.12:39 He sands the fiberglass, applies an Epifanes epoxy primer, and prepares the surfaces for anti-fouling paint.15:36 The rudder repair process involves layering epoxy and fiberglass to address areas where the original material had worn away or was missing.14:24 Beyond the rudders, he plans to seal through-hull fittings located below the waterline, following advice from Hanneke and his audience.18:59 He identifies significant rot in the cabin tops and beam troughs, which complicates his ongoing window repair project.19:53 He powers his tools using portable power banks rather than yard electricity.11:03 With a goal to relaunch the boat in two months, he prioritizes structural repairs to the through-hulls and cabin tops.20:04

Ver en YouTube

Más de Wildling Sailing

One Step Back, One Step Sideways & One Step Forward | My Budget Catamaran Refitoct 2026I Lifted Her Out For a Very Important Rebuild.sept 2026One Final Refit Before Crossing The Atlantic.ago 20262 Days Alone at Sea On my Primitive Double-Canoe.ago 2026

De Wildling Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema