MJ Sailingvídeo
These Projects Can't Be Done Until We're Outside (MJ Sailing - Ep 342)
14 de septiembre de 2024 · 14 min · 61K visitas
Qué cubre este vídeo
Construction on a custom catamaran continues outside the build tent, focusing on structural bonding and hull extensions.Watch The crew plans to bond the bow nose cones to the hull using a methacrylate agent, followed by fiberglass reinforcement on both the interior and exterior.2:20 To ensure structural integrity, they will cut access holes in the forward watertight bulkhead to glass the interior flange before sealing the openings.2:50 The project also includes extending the stern by two feet to accommodate kick-up, stern-mounted rudders, which requires coring, glassing, and raising the cockpit floor by four inches to improve drainage and rudder support.4:32 Future work scheduled for spring involves installing a composite forebeam and lingeron to distribute forestay loads and support the bowsprit.7:43 Meanwhile, the team is reinforcing the empty build tent with new baseboards and belly bands before applying fresh shrink wrap for winter protection.10:18 The project demonstrates that complex structural modifications require precise temperature control for resin curing and careful planning for internal access.
Más de MJ Sailing
De MJ Sailing — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



