MJ Sailingvideo

These Projects Can't Be Done Until We're Outside (MJ Sailing - Ep 342)

14 de septiembre de 2024 · 14 min · 61K vistas

¿Qué cubre este video?

Construction on a custom catamaran continues outside the build tent, focusing on structural bonding and hull extensions.Watch The crew plans to bond the bow nose cones to the hull using a methacrylate agent, followed by fiberglass reinforcement on both the interior and exterior.2:20 To ensure structural integrity, they will cut access holes in the forward watertight bulkhead to glass the interior flange before sealing the openings.2:50 The project also includes extending the stern by two feet to accommodate kick-up, stern-mounted rudders, which requires coring, glassing, and raising the cockpit floor by four inches to improve drainage and rudder support.4:32 Future work scheduled for spring involves installing a composite forebeam and lingeron to distribute forestay loads and support the bowsprit.7:43 Meanwhile, the team is reinforcing the empty build tent with new baseboards and belly bands before applying fresh shrink wrap for winter protection.10:18 The project demonstrates that complex structural modifications require precise temperature control for resin curing and careful planning for internal access.

Ver en YouTube

Más de MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)ago 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)jul 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)jun 2026Preparing Our Catamaran for Paint—and Me for Captain's Schooljun 2026

De MJ Sailing — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema