MJ Sailingvidéo

These Projects Can't Be Done Until We're Outside (MJ Sailing - Ep 342)

14 septembre 2024 · 14 min · 61K vues

Ce que couvre cette vidéo

Construction on a custom catamaran continues outside the build tent, focusing on structural bonding and hull extensions.Watch The crew plans to bond the bow nose cones to the hull using a methacrylate agent, followed by fiberglass reinforcement on both the interior and exterior.2:20 To ensure structural integrity, they will cut access holes in the forward watertight bulkhead to glass the interior flange before sealing the openings.2:50 The project also includes extending the stern by two feet to accommodate kick-up, stern-mounted rudders, which requires coring, glassing, and raising the cockpit floor by four inches to improve drainage and rudder support.4:32 Future work scheduled for spring involves installing a composite forebeam and lingeron to distribute forestay loads and support the bowsprit.7:43 Meanwhile, the team is reinforcing the empty build tent with new baseboards and belly bands before applying fresh shrink wrap for winter protection.10:18 The project demonstrates that complex structural modifications require precise temperature control for resin curing and careful planning for internal access.

Regarder sur YouTube

Plus de vidéos de MJ Sailing

How Can a Light Switch Be SO COMPLICATED??!! (MJ Sailing - Episode 381)août 2026Painting the Accent Walls On Our Home Built Catamaran (MJ Sailing - Episode 380)juil. 2026The Details That Keep a Boat Dry (MJ Sailing - Episode 379)juin 2026Preparing Our Catamaran for Paint—and Me for Captain's Schooljuin 2026

De MJ Sailing — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.

The Sailing Directory Newsletter

Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.

Signaler un problème