Sailing Squibvídeo

Squib's Refit - testing new camera - trim frames around foredeck hatches - Tulln Boat Show /120

22 de mayo de 2025 · 17 min · 717 visitas · Tulln an der Donau

Qué cubre este vídeo

To prepare for interior finishing on the boat Squib, the owner constructs two wooden frames to mount around the foredeck hatches.0:50 He cuts 4 cm strips from a 140 cm board to create frames with 46 x 35 cm interior dimensions, using screws to secure the joints.2:24 Because the cabin ceiling is uneven and non-symmetrical, he performs custom trimming and flattening on the frames to ensure a flush fit.7:18 He bonds the frames to the ceiling using thickened epoxy, filling larger gaps with closed-cell foam to prevent condensation and mold growth in hidden voids.11:55 Additionally, he constructs a shelf for the starboard hull and installs electrical outlets and switches in the galley.4:35 He uses an electric heater to maintain a cabin temperature of 22 degrees Celsius to ensure proper epoxy curing during cool spring nights.16:30 The project concludes with the frames bonded in place, awaiting final sanding and the installation of Armaflex insulation.12:48

Ver en YouTube

Más de Sailing Squib

Sailing Squib - May 2026/3sept 2026Sailing Squib May 2026 /2ago 2026Sailing Squib - Contemporary Witnessjul 2026Sailing Squib - May 2026 /1jul 2026

De Sailing Squib — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema