Sailing Squibvidéo
Squib's Refit - testing new camera - trim frames around foredeck hatches - Tulln Boat Show /120
22 mai 2025 · 17 min · 717 vues · Tulln an der Donau
Ce que couvre cette vidéo
To prepare for interior finishing on the boat Squib, the owner constructs two wooden frames to mount around the foredeck hatches.0:50 He cuts 4 cm strips from a 140 cm board to create frames with 46 x 35 cm interior dimensions, using screws to secure the joints.2:24 Because the cabin ceiling is uneven and non-symmetrical, he performs custom trimming and flattening on the frames to ensure a flush fit.7:18 He bonds the frames to the ceiling using thickened epoxy, filling larger gaps with closed-cell foam to prevent condensation and mold growth in hidden voids.11:55 Additionally, he constructs a shelf for the starboard hull and installs electrical outlets and switches in the galley.4:35 He uses an electric heater to maintain a cabin temperature of 22 degrees Celsius to ensure proper epoxy curing during cool spring nights.16:30 The project concludes with the frames bonded in place, awaiting final sanding and the installation of Armaflex insulation.12:48
Plus de vidéos de Sailing Squib
De Sailing Squib — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



