Salt & Tarvídeo

Salt & Tar: Ep 119- Our First Volunteers

24 de diciembre de 2020 · 21 min · 62K visitas · California

Qué cubre este vídeo

Garrett and Ruth continue the final outfitting of their self-built boat, focusing on rigging and mechanical systems before hosting their first volunteers, Josh and Alexis. The crew completes the upper whisker stays and hoists the bowsprit to finalize rigging geometry.6:01 To provide accurate measurements for their sailmaker, Mike, they hoist a temporary boom to determine the main and mizzen luff lengths and calculate mast rake using a 10-foot baseline measurement.8:04 With the arrival of their volunteers, the team shifts to interior systems.11:55 Alexis installs pressurized salt and freshwater lines throughout the vessel, including deck washdown spigots.13:04 Josh focuses on the engine room, cleaning water separators, installing primary fuel filters, and running fuel lines.14:33 Garrett completes the shift and throttle control mounting, requiring a custom wooden spacer to clear a floor timber.15:27 The volunteers work for 10 days, allowing the owners to transition into a project-management role and accelerate the installation of critical boat systems.13:10

Ver en YouTube

Más de Salt & Tar

Salt & Tar: Ep.357- Finishing What We Startedsept 2026Salt & Tar: Ep.356- Dock Lifeago 2026Salt & Tar: Ep.355- Serenely Afloat in a Hustling Harborago 2026Salt & Tar: Ep.354- Enjoying the Sensation of Floatingago 2026

De Salt & Tar — mira el barco del canal, la tripulación y cada vídeo analizado.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.

Informar de un problema