Salt & Tarvideo

Salt & Tar: Ep 119- Our First Volunteers

24 December 2020 · 21 min · 62K views · California

What this video covers

Garrett and Ruth continue the final outfitting of their self-built boat, focusing on rigging and mechanical systems before hosting their first volunteers, Josh and Alexis. The crew completes the upper whisker stays and hoists the bowsprit to finalize rigging geometry.6:01 To provide accurate measurements for their sailmaker, Mike, they hoist a temporary boom to determine the main and mizzen luff lengths and calculate mast rake using a 10-foot baseline measurement.8:04 With the arrival of their volunteers, the team shifts to interior systems.11:55 Alexis installs pressurized salt and freshwater lines throughout the vessel, including deck washdown spigots.13:04 Josh focuses on the engine room, cleaning water separators, installing primary fuel filters, and running fuel lines.14:33 Garrett completes the shift and throttle control mounting, requiring a custom wooden spacer to clear a floor timber.15:27 The volunteers work for 10 days, allowing the owners to transition into a project-management role and accelerate the installation of critical boat systems.13:10

Watch on YouTube

More from Salt & Tar

Salt & Tar: Ep.361- IN-THE-WATER SurveyOct 2026Meet Victoria - Tour of our William Garden 'Porpoise' built by Robin Fung in 1975Oct 2026Salt & Tar: Ep.360- Good NewsOct 2026Salt & Tar: Ep.359- Memory LaneSept 2026

From Salt & Tar — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue