Salt & Tarvídeo

Salt & Tar: Ep 119- Our First Volunteers

24 de dezembro de 2020 · 21 min · 62K visualizações · California

O que este vídeo aborda

Garrett and Ruth continue the final outfitting of their self-built boat, focusing on rigging and mechanical systems before hosting their first volunteers, Josh and Alexis. The crew completes the upper whisker stays and hoists the bowsprit to finalize rigging geometry.6:01 To provide accurate measurements for their sailmaker, Mike, they hoist a temporary boom to determine the main and mizzen luff lengths and calculate mast rake using a 10-foot baseline measurement.8:04 With the arrival of their volunteers, the team shifts to interior systems.11:55 Alexis installs pressurized salt and freshwater lines throughout the vessel, including deck washdown spigots.13:04 Josh focuses on the engine room, cleaning water separators, installing primary fuel filters, and running fuel lines.14:33 Garrett completes the shift and throttle control mounting, requiring a custom wooden spacer to clear a floor timber.15:27 The volunteers work for 10 days, allowing the owners to transition into a project-management role and accelerate the installation of critical boat systems.13:10

Ver no YouTube

Mais de Salt & Tar

Salt & Tar: Ep.357- Finishing What We Started09/2026Salt & Tar: Ep.356- Dock Life08/2026Salt & Tar: Ep.355- Serenely Afloat in a Hustling Harbor08/2026Salt & Tar: Ep.354- Enjoying the Sensation of Floating08/2026

De Salt & Tar — veja o barco, a tripulação e todos os vídeos analisados do canal.

The Sailing Directory Newsletter

Um email com os melhores achados da frota — os momentos, barcos e histórias que valem o seu tempo de visualização. Insira o seu endereço para receber a sua cópia.

Reportar um problema