GETTING SURGERY IN THE PHILIPPINES 😭 - (Episode 313)
18 de mayo de 2025 · 22 min · 187K visitas
Qué cubre este vídeo
The crew of *Parlay Revival* undertakes a major refit in Cebu, Philippines, focusing on installing a full cockpit enclosure to protect the flybridge from weather.0:29 They mount aluminum flashing around the existing hardtop to provide a mounting surface for bolt rope tracks, securing the tracks with screws at 150-millimeter intervals.2:22 The project requires 26 square yards of clear vinyl and new Sunbrella fabric for outdoor cushions, with labor contracted to a local upholsterer for an estimated 110,000 pesos.1:13 During the refit, contractors attempting to mold a section of the non-skid deck accidentally damage the surface and destroy a foil board by trapping heat under plastic sheeting.8:04 Separately, the owner undergoes a complex surgical extraction of a sideways wisdom tooth in Cebu City.15:07 The procedure involves removing part of the jawbone to access roots wrapped around a nerve, performed under local anesthesia by Dr. Ian Lucero.17:08
Barcos en este vídeo
Más de Sailing Parlay Revival
De Sailing Parlay Revival — mira el barco del canal, la tripulación y cada vídeo analizado.
The Sailing Directory Newsletter
Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que merecen tu tiempo de visionado. Introduce tu dirección para recibir tu propia copia.



