GETTING SURGERY IN THE PHILIPPINES 😭 - (Episode 313)
18 mai 2025 · 22 min · 187K vues
Ce que couvre cette vidéo
The crew of *Parlay Revival* undertakes a major refit in Cebu, Philippines, focusing on installing a full cockpit enclosure to protect the flybridge from weather.0:29 They mount aluminum flashing around the existing hardtop to provide a mounting surface for bolt rope tracks, securing the tracks with screws at 150-millimeter intervals.2:22 The project requires 26 square yards of clear vinyl and new Sunbrella fabric for outdoor cushions, with labor contracted to a local upholsterer for an estimated 110,000 pesos.1:13 During the refit, contractors attempting to mold a section of the non-skid deck accidentally damage the surface and destroy a foil board by trapping heat under plastic sheeting.8:04 Separately, the owner undergoes a complex surgical extraction of a sideways wisdom tooth in Cebu City.15:07 The procedure involves removing part of the jawbone to access roots wrapped around a nerve, performed under local anesthesia by Dr. Ian Lucero.17:08
Bateaux dans cette vidéo
Plus de vidéos de Sailing Parlay Revival
De Sailing Parlay Revival — voir le bateau, l'équipage et chaque vidéo analysée de la chaîne.
The Sailing Directory Newsletter
Un e-mail avec les meilleures trouvailles de la flotte — les moments, les bateaux et les histoires qui valent la peine d'être regardés. Entrez votre adresse pour recevoir votre propre exemplaire.



