GETTING SURGERY IN THE PHILIPPINES 😭 - (Episode 313)
18 May 2025 · 22 min · 187K views
What this video covers
The crew of *Parlay Revival* undertakes a major refit in Cebu, Philippines, focusing on installing a full cockpit enclosure to protect the flybridge from weather.0:29 They mount aluminum flashing around the existing hardtop to provide a mounting surface for bolt rope tracks, securing the tracks with screws at 150-millimeter intervals.2:22 The project requires 26 square yards of clear vinyl and new Sunbrella fabric for outdoor cushions, with labor contracted to a local upholsterer for an estimated 110,000 pesos.1:13 During the refit, contractors attempting to mold a section of the non-skid deck accidentally damage the surface and destroy a foil board by trapping heat under plastic sheeting.8:04 Separately, the owner undergoes a complex surgical extraction of a sideways wisdom tooth in Cebu City.15:07 The procedure involves removing part of the jawbone to access roots wrapped around a nerve, performed under local anesthesia by Dr. Ian Lucero.17:08
Boats in this video
More from Sailing Parlay Revival
From Sailing Parlay Revival — see the channel’s boat, crew, and every analysed video.
The Sailing Directory Newsletter
One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.



