Sail Lifevideo
The road back to boat work: Bunker Makeover! Ep. 696
20 settembre 2026 · 21 min · 75K visualizzazioni
Cosa tratta questo video
Mads converts a concrete hurricane shelter into a climate-controlled technical workspace for the Sail Life Global headquarters.0:45 He clears the structure of existing bunks, a water tank, and a water heater to create an open interior.2:06 To address moisture issues, he plans to seal the exterior walls and roof with liquid rubber and install an interior airlock with an insulated door.2:20 He frames the interior walls with a two-inch gap for spray foam insulation and rockwool, targeting an R-value of 28 to 29.10:06 During the process, he relocates an existing mini-split unit and discovers an improperly wired subpanel that remains energized despite the main breaker being switched off.15:09 Separately, he prepares a shipping container workshop for relocation by securing the CNC machine and its components to the floor.5:52 He plans to hire a new transportation company for the move after experiencing delays with his initial contractor.17:41
Barche in questo video
Altro da Sail Life
Da Sail Life — guarda la barca, l'equipaggio e ogni video analizzato del canale.
The Sailing Directory Newsletter
Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.



