Sail Lifevideo

The road back to boat work: Bunker Makeover! Ep. 696

20 September 2026 · 21 min · 75K views

What this video covers

Mads converts a concrete hurricane shelter into a climate-controlled technical workspace for the Sail Life Global headquarters.0:45 He clears the structure of existing bunks, a water tank, and a water heater to create an open interior.2:06 To address moisture issues, he plans to seal the exterior walls and roof with liquid rubber and install an interior airlock with an insulated door.2:20 He frames the interior walls with a two-inch gap for spray foam insulation and rockwool, targeting an R-value of 28 to 29.10:06 During the process, he relocates an existing mini-split unit and discovers an improperly wired subpanel that remains energized despite the main breaker being switched off.15:09 Separately, he prepares a shipping container workshop for relocation by securing the CNC machine and its components to the floor.5:52 He plans to hire a new transportation company for the move after experiencing delays with his initial contractor.17:41

Watch on YouTube

Boats in this video

Antares Yachts 44Their boat

More from Sail Life

The road back to boat work: The square eagle has landed! Ep. 695Sept 2026The road back to boat work: We're gravel rich & ready for shipping containers! Ep. 694Sept 2026Can I build an aluminum fuel tank with the xTool MetalFab laser welder and CNC? Ep. 693Aug 2026The road back to boat work: shipping delays, site prep and bending metal with a 3D print Ep. 692Aug 2026

From Sail Life — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue