Sven Yrvindvideo

First Steps on the Budget Boat.

15 de septiembre de 2026 · 3 min · 7K vistas

¿Qué cubre este video?

Sven Yrvind designs a new 5-meter by 1.3-meter boat, refining the dimensions from an earlier 3.6-meter design.0:22 The updated hull shape incorporates a transom and two dedicated workbays, one forward and one aft, to prevent water ingress in the middle of the boat during heavy seas, a problem encountered during a 2011 voyage to Martinique.0:58 The design process involves constructing a 1:5 scale model to test hull shapes and adjustments, moving away from the previous sprit sail configuration in favor of a balanced lug sail.2:08 Construction of the model began on September 26th, serving as a physical reference for the final build.2:26 The project prioritizes stability and seaworthiness through iterative modeling and structural modifications based on past offshore experience.

Ver en YouTube

Más de Sven Yrvind

Plan B — B as in Budget.sep 2026The boat is on the trailer.sep 20262 Masts down, ready for the trailer.sep 2026Back to Work.sep 2026

De Sven Yrvind — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema