Sven Yrvindvideo

2 Masts down, ready for the trailer.

8 de septiembre de 2026 · 2 min · 5K vistas

¿Qué cubre este video?

Sven Yrvind prepares his boat for transport by lowering the two foremasts and the boom.0:53 He secures the spars using knots and black lifting ropes to ensure they remain stationary during transit.1:03 The boom requires additional clearance and a secondary knob to improve stability, though he prioritizes launching the boat over making these mechanical refinements.0:14 He removes the wheels and adjusts the screws to finalize the configuration for the trailer.1:55 The process highlights the iterative nature of boat rigging, where initial tolerances often require adjustment after the first assembly.

Ver en YouTube

Más de Sven Yrvind

Back to Work.sep 2026A Non Bloated Boat in a Bloated World.sep 2026No access to boat sat and sunday.sep 2026Fixing water collection and trailer adaption.sep 2026

De Sven Yrvind — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema