Project Brupegvideo

Smashing paint off with a hammer drill - Project Brupeg Ep. 181

23 de noviembre de 2020 · 23 min · 32K vistas

¿Qué cubre este video?

Damien and Jess perform maintenance on the steel hull and gates of their expedition boat, Brupeg, while preparing for launch. The crew removes old, heavy steel gates to resize them and replace failing hinges.0:41 Because the original hinges were not strong enough to support the weight of the 6mm steel gates, Damien abandons a plan to use tapped holes and captive nuts, opting instead to fabricate custom stainless steel hinges using a new plasma cutter.20:42 The team also strips chlorinated rubber paint from the hull using a hammer drill, as the material resists sandblasting.10:37 To manage rust on the hull, they employ a wet-blasting process followed by a phosphoric acid treatment and epoxy primer, a method they have found effective for their specific conditions.13:00 The crew also replaces diesel-contaminated Intermediate Bulk Containers (IBCs) and cleans the interior of the boat to prevent dust-related corrosion.9:02 The project demonstrates that upgrading to a more robust hinge design early prevents future structural failures.

Ver en YouTube

Más de Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462sep 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461sep 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460sep 2026

De Project Brupeg — ve el barco, la tripulación y cada video analizado del canal.

The Sailing Directory Newsletter

Un correo electrónico con los mejores hallazgos de la flota: los momentos, barcos e historias que valen tu tiempo de visualización. Ingresa tu propia dirección para obtener tu propia copia.

Reportar un problema