Project Brupegvideo

Smashing paint off with a hammer drill - Project Brupeg Ep. 181

23 novembre 2020 · 23 min · 32K visualizzazioni

Cosa tratta questo video

Damien and Jess perform maintenance on the steel hull and gates of their expedition boat, Brupeg, while preparing for launch. The crew removes old, heavy steel gates to resize them and replace failing hinges.0:41 Because the original hinges were not strong enough to support the weight of the 6mm steel gates, Damien abandons a plan to use tapped holes and captive nuts, opting instead to fabricate custom stainless steel hinges using a new plasma cutter.20:42 The team also strips chlorinated rubber paint from the hull using a hammer drill, as the material resists sandblasting.10:37 To manage rust on the hull, they employ a wet-blasting process followed by a phosphoric acid treatment and epoxy primer, a method they have found effective for their specific conditions.13:00 The crew also replaces diesel-contaminated Intermediate Bulk Containers (IBCs) and cleans the interior of the boat to prevent dust-related corrosion.9:02 The project demonstrates that upgrading to a more robust hinge design early prevents future structural failures.

Guarda su YouTube

Altro da Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463ott 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462set 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461set 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460set 2026

Da Project Brupeg — guarda la barca, l'equipaggio e ogni video analizzato del canale.

The Sailing Directory Newsletter

Una email con le migliori scoperte della flotta — i momenti, le barche e le storie che meritano il tuo tempo di visione. Inserisci il tuo indirizzo per riceverne una copia.

Segnala un problema