Project Brupegvideo

Smashing paint off with a hammer drill - Project Brupeg Ep. 181

23 November 2020 · 23 min · 32K views

What this video covers

Damien and Jess perform maintenance on the steel hull and gates of their expedition boat, Brupeg, while preparing for launch. The crew removes old, heavy steel gates to resize them and replace failing hinges.0:41 Because the original hinges were not strong enough to support the weight of the 6mm steel gates, Damien abandons a plan to use tapped holes and captive nuts, opting instead to fabricate custom stainless steel hinges using a new plasma cutter.20:42 The team also strips chlorinated rubber paint from the hull using a hammer drill, as the material resists sandblasting.10:37 To manage rust on the hull, they employ a wet-blasting process followed by a phosphoric acid treatment and epoxy primer, a method they have found effective for their specific conditions.13:00 The crew also replaces diesel-contaminated Intermediate Bulk Containers (IBCs) and cleans the interior of the boat to prevent dust-related corrosion.9:02 The project demonstrates that upgrading to a more robust hinge design early prevents future structural failures.

Watch on YouTube

More from Project Brupeg

What caused the steering to fail - Project Brupeg Ep.463Oct 2026CHAOS! & our first Night Time Trailer Haul Out - Project Brupeg Ep.462Sept 2026Look, It's possible we should have cleaned this before now... Project Brupeg Ep.461Sept 2026The Ridiculously Powerful Davit Winch - Project Brupeg Ep.460Sept 2026

From Project Brupeg — see the channel’s boat, crew, and every analysed video.

The Sailing Directory Newsletter

One email with the fleet's best finds — the moments, boats, and stories worth your watch time. Enter your own address to get your own copy.

Report an issue